📐 Crushed Stone Square Footage Estimator

sq ft
E.g. 500 sq ft for a 10×50 ft driveway section
in
Typical: 2" for walkways, 3" for top dressing, 4" for driveway bases
Total Crushed Stone Required
6.48 Tons
12,963 lbs (US Short Tons)
Volume 4.63 yd³ Cubic Yards
50 lb Bags 260 Retail Bags
Cubic Feet 125 ft³ Total Volume
Pro Tip: Quarries deliver in full ton increments. We recommend ordering 7.0 tons (approx +5-10% extra for subgrade settling and compaction).

Crushed Stone Square Feet to Tons Quick Coverage Chart

Estimated tons of standard #57 Crushed Stone (1.4 tons/yd³) required for common residential project areas:

Square Footage 2" Depth (Walkways) 3" Depth (Driveway Top) 4" Depth (Sturdy Base) 6" Depth (Heavy Base)
100 sq ft 0.86 Tons 1.3 Tons 1.73 Tons 2.59 Tons
200 sq ft 1.73 Tons 2.59 Tons 3.46 Tons 5.19 Tons
500 sq ft 4.32 Tons 6.48 Tons 8.64 Tons 12.96 Tons
1,000 sq ft 8.64 Tons 12.96 Tons 17.28 Tons 25.93 Tons
2,000 sq ft 17.28 Tons 25.93 Tons 34.57 Tons 51.85 Tons

How to Calculate Crushed Stone by Hand: Step-by-Step

If you want to manually verify your quarry delivery order, use the universal civil engineering formula:

Cubic Yards = (Square Feet × Depth in Inches) ÷ 324
Tons Needed = Cubic Yards × 1.40 tons/yd³ (for #57 Stone)

Why divide by 324? There are 27 cubic feet in one cubic yard. Since 1 foot has 12 inches, one cubic yard contains 27 × 12 = 324 inch-feet. Dividing your area in square feet multiplied by depth in inches directly yields cubic yards.

Frequently Asked Questions

How many square feet does 1 ton of crushed stone cover?

At a standard 2-inch depth, 1 US ton of #57 crushed stone covers approximately 115 to 120 square feet. At a 3-inch depth, 1 ton covers roughly 75 to 80 square feet. At a 4-inch base depth, 1 ton covers about 55 to 60 square feet.

How do you calculate crushed stone from square feet?

Step 1: Multiply your square footage by your desired depth in inches, then divide by 324 to get cubic yards: Cubic Yards = (Square Feet × Depth in Inches) ÷ 324. Step 2: Multiply cubic yards by the stone density (typically 1.4 tons per yard): Tons = Cubic Yards × 1.4.

What is the recommended crushed stone depth for a driveway?

A new gravel driveway typically requires a total depth of 8 to 12 inches divided into layers: a 4-inch sub-base of #4 heavy stone, a 4-inch base layer of Crusher Run (DGA) compacted thoroughly, and a 2- to 3-inch surface layer of clean #57 crushed stone.

How many 50 lb bags of crushed stone do I need per 100 square feet?

At a 2-inch depth (approx 0.62 cubic yards or 1,730 lbs), you need approximately 35 bags of 50 lb crushed stone for 100 sq ft. At 3 inches deep, you need approximately 52 bags.